Sie befinden Sich nicht im Netzwerk der Universität Paderborn. Der Zugriff auf elektronische Ressourcen ist gegebenenfalls nur via VPN oder Shibboleth (DFN-AAI) möglich. mehr Informationen...
Ergebnis 10 von 18
Water research (Oxford), 2001-12, Vol.35 (18), p.4267-4276
2001
Volltextzugriff (PDF)

Details

Autor(en) / Beteiligte
Titel
Pre-acidification in anaerobic sludge bed process treating brewery wastewater
Ist Teil von
  • Water research (Oxford), 2001-12, Vol.35 (18), p.4267-4276
Ort / Verlag
Oxford: Elsevier Ltd
Erscheinungsjahr
2001
Quelle
Elsevier Journal Backfiles on ScienceDirect (DFG Nationallizenzen)
Beschreibungen/Notizen
  • The effect of pre-acidification on anaerobic granule bed processes treating brewery wastewater was the focus of a comparison study employing two configurations, (a) a single stage upflow anaerobic sludge bed (UASB) and (b) an upflow acidification reactor in series with a methanogenic UASB. The pre-acidification reactor achieved 20±4% SCOD removal and 0.08±0.003 L of methane produced per gram of SCOD removal at a hydraulic retention time (HRT) of 0.75–4 h. Butyric acid was not detected and short chain fatty acids (SCFAs) were mainly acetic and propionic acids. The acidification ratio was about 0.42±0.02 g SCFAs as COD/g of influent COD. Both systems’ critical loading rate to achieve 80% COD removal was established at 34–39 kg COD/m 3 of total sludge bed volume per day. SCOD removal efficiency of 90±3% was achieved by both systems at an organic loading rate of 25±1 kg COD/m 3 of total sludge bed volume per day, indicating that the installation of an acidification reactor had no effect in terms of the maximum granular activity, biomass granulation and the settleability of granules. At an organic loading rate of 67 kg COD/m 3 of total sludge bed volume per day at an HRT of 1 h, the series system outperformed the single UASB by a removal of 62 compared to 57%.

Weiterführende Literatur

Empfehlungen zum selben Thema automatisch vorgeschlagen von bX