Sie befinden Sich nicht im Netzwerk der Universität Paderborn. Der Zugriff auf elektronische Ressourcen ist gegebenenfalls nur via VPN oder Shibboleth (DFN-AAI) möglich. mehr Informationen...
Ergebnis 12 von 19

Details

Autor(en) / Beteiligte
Titel
A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts
Ist Teil von
  • Construction innovation, 2024-01, Vol.24 (1), p.384-406
Ort / Verlag
London: Emerald Publishing Limited
Erscheinungsjahr
2024
Quelle
Emerald Management 200
Beschreibungen/Notizen
  • Purpose In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated project delivery (IPD) practices including early involvement of stakeholders and multiparty contracts which its combination with advanced technologies such as blockchain can lead to better dispute management and improve the whole construction process. Design/methodology/approach Based on literature review, the alternative dispute resolution (ADR) for IPD contacts were identified, and three formats of IPD contracts were selected, and the dispute resolution process of them has been analyzed. Then, based on blockchain review, a conceptual blockchain-based dispute management (BDM) model was generated for ADR in IPD. Model validation was done by an interview. Experts were asked to compare the BDM model with the traditional system regarding the ADR duration. Findings Analyses of the collected data from the experts demonstrated that the BDM model has better function in terms of time and cost for ADR process when the project is facing serious and considerable number of disputes. The relation between blockchain technology (BCT) and building information modeling (BIM) has been examined through a framework, and the ability of the proposed model for administrating dispute resolution process has been verified using four different scenarios of construction claims that show the system can run successfully. Originality The current study proposes a truthful model, reliable framework to address the problem of project dispute management in IPD contracts. The system combines the ability to being unchangeable and the reliability characteristics of BCT with informative and automation aspects of BIM together to improve dispute resolution issue in the IPD system.
Sprache
Englisch
Identifikatoren
ISSN: 1471-4175
eISSN: 1471-4175, 1477-0857
DOI: 10.1108/CI-01-2023-0008
Titel-ID: cdi_proquest_journals_2911045250

Weiterführende Literatur

Empfehlungen zum selben Thema automatisch vorgeschlagen von bX