Sie befinden Sich nicht im Netzwerk der Universität Paderborn. Der Zugriff auf elektronische Ressourcen ist gegebenenfalls nur via VPN oder Shibboleth (DFN-AAI) möglich. mehr Informationen...

Details

Autor(en) / Beteiligte
Titel
Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Ist Teil von
  • Journal of physics. Conference series, 2023-01, Vol.2420 (1), p.12021
Ort / Verlag
Bristol: IOP Publishing
Erscheinungsjahr
2023
Link zum Volltext
Quelle
EZB Electronic Journals Library
Beschreibungen/Notizen
  • Abstract KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
Sprache
Englisch
Identifikatoren
ISSN: 1742-6588
eISSN: 1742-6596
DOI: 10.1088/1742-6596/2420/1/012021
Titel-ID: cdi_crossref_primary_10_1088_1742_6596_2420_1_012021

Weiterführende Literatur

Empfehlungen zum selben Thema automatisch vorgeschlagen von bX