Sie befinden Sich nicht im Netzwerk der Universität Paderborn. Der Zugriff auf elektronische Ressourcen ist gegebenenfalls nur via VPN oder Shibboleth (DFN-AAI) möglich. mehr Informationen...

Details

Autor(en) / Beteiligte
Titel
Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor
Ist Teil von
  • The International journal of pressure vessels and piping, 2021-02, Vol.189, p.104281, Article 104281
Ort / Verlag
Elsevier Ltd
Erscheinungsjahr
2021
Link zum Volltext
Quelle
Alma/SFX Local Collection
Beschreibungen/Notizen
  • Risk-based inspection (RBI) offers the most cost-effective operation and maintenance strategy for minimizing overall risks and making financial and safety improvements within a power plant. Risk assessment may also benefit decision-making with regards to plant design and equipment manufacturing processes. The purpose of this study is to propose a quantitative RBI methodology that can be applied to a high-energy piping system operating at elevated temperatures and high pressures in power plants. Three major steps involved are: (i) using generic mean time to failure (MTTF), specified as the expected lifetime of the equipment obtained from a theoretical equation; (ii) adding a modification factor that identifies the specific conditions that can influence the failure rate; and (iii) incorporating individual inspection locations as a factor in risk evaluation. Probability-of-failure (POF) assessment was conducted using a Weibull distribution with MTTF and the modification factor. In addition, consequence-of-failure (COF) assessment was conducted based on financial consequences in terms of downtime costs per day and the length of downtime due to failure. The main steam piping system in a thermal power plant was selected as the case study unit. The actual inspection locations where damage to components could frequently occur were defined as risk evaluation targets for the RBI. The generic MTTF for the main steam piping system was evaluated using the Larson-Miller parameter (LMP) equation for creep rupture time. Piping system stress analysis was conducted to obtain the stress applied to the LMP. An equation for the modification factor applied to the main steam piping system was also proposed based on five subfactors. •Quantitative RBI methodology is proposed for high-energy piping in a power plant.•The generic mean time to failure (MTTF) in two-parameter Weibull distribution was defined as the service life of the pipe.•Previous inspection locations where pipe damage frequently occurred, were risk evaluation points in conducting RBI.•Inspection period was determined based on the risk target considering generic and additional uncertainties.
Sprache
Englisch
Identifikatoren
ISSN: 0308-0161
eISSN: 1879-3541
DOI: 10.1016/j.ijpvp.2020.104281
Titel-ID: cdi_crossref_primary_10_1016_j_ijpvp_2020_104281

Weiterführende Literatur

Empfehlungen zum selben Thema automatisch vorgeschlagen von bX