Sie befinden Sich nicht im Netzwerk der Universität Paderborn. Der Zugriff auf elektronische Ressourcen ist gegebenenfalls nur via VPN oder Shibboleth (DFN-AAI) möglich. mehr Informationen...
Ergebnis 3 von 246

Details

Autor(en) / Beteiligte
Titel
Thermal energy storage for increased waste heat recovery at a silicon production plant in Norway
Ist Teil von
  • Applied thermal engineering, 2022-10, Vol.215, p.118909, Article 118909
Ort / Verlag
Elsevier Ltd
Erscheinungsjahr
2022
Link zum Volltext
Quelle
Alma/SFX Local Collection
Beschreibungen/Notizen
  • •Case study of a heat recovery system in a Norwegian silicon production plant.•Novel field of application for Ruths steam accumulator.•Combined approach of techno-economic optimization and dynamic system simulation.•Thermal storage increases annual electricity production by up to 500MW h.•Public funds required to achieve desirable payback periods. The production of silicon is an energy-intensive process, which requires high temperatures. Sudden release of high-temperature gas to the exhaust system is an inevitable part of silicon furnace operation and causes strong fluctuations in the waste heat recovery system. This makes waste heat recovery challenging and leads to frequent throttling of the produced steam reducing the efficiency of the system. To avoid this throttling and thus increase system efficiency, retrofitting a thermal energy storage to the existing waste heat recovery system is analyzed for a silicon production plant in Norway. A steam accumulator installed in parallel to existing bypasses, which does not interfere with the existing waste heat recovery system, is found to be ideally suited for the case. The analysis is carried out using real plant data, which is used to calibrate a dynamic simulation model modelled in the Modelica language. Design parameters of the steam accumulator are identified based on economic optimizations and their performance is verified with the dynamic simulation model. The simulation results shows that the simplifications in the economic optimizations are acceptable and that storage sizes of less than 10 m3 can lead to annual profits of around 23 k€. Investment costs excluding transport and on-site installation are around 120 k€, yielding payback times from three to six years, depending on public funds. Including transport and on-site installation increases the payback times to about seven to ten years. The integration of a storage of this size was deemed realistic by the plant operators. The results will therefore be used for the creation of a business case with a more detailed cost analysis.
Sprache
Englisch
Identifikatoren
ISSN: 1359-4311
DOI: 10.1016/j.applthermaleng.2022.118909
Titel-ID: cdi_crossref_primary_10_1016_j_applthermaleng_2022_118909

Weiterführende Literatur

Empfehlungen zum selben Thema automatisch vorgeschlagen von bX